Certifications & quality

Certified — and dated.

Each certificate is listed with its scope and validity, and leaves this page automatically when it expires. Test reports are available on request.

ISO 9001 certificateCE certificate of conformity

Certificates

What we hold, and until when.

  • ISO 9001
    ISO 9001Quality management systemvalid to 2029-04
  • ISO 14001
    ISO 14001Environmental management systemvalid to 2028-06
  • ISO 45001
    ISO 45001Occupational health and safety management systemvalid to 2028-06
  • CE
    CECertificate of conformity · AW-ZP in-line series (LVD, EMC, Machinery)valid to 2027-01
  • After-sales service
    After-sales serviceCommodity after-sales service certification · GB/T 27922valid to 2029-06
  • National High-tech Enterprise
    National High-tech EnterpriseIssued November 2024 · valid three yearsvalid to 2027-11
  • Specialized and Innovative SME
    Specialized and Innovative SMEJiangsu Province · 2025–2028valid to 2028-12
  • Specialized and Innovative SME
    Specialized and Innovative SMEWuxi · 2024–2026valid to 2026-12
  • Wuxi High-tech Product
    Wuxi High-tech ProductNew in-line plasma cleaning machinevalid to 2028-02
  • CEPEA member
    CEPEA memberChina Electronics Production Equipment Industry Associationvalid to 2026-12
  • JSSIA member
    JSSIA memberJiangsu Semiconductor Industry Associationvalid to 2026-12
  • Scans of the issued certificates · each one is removed from this page after its expiry date

Available on request.

  • PDF
    Electromagnetic radiation test report — AW-ZP04BPlasma equipment AW-ZP04B · January 2026
    Request
  • PDF
    Test report — intelligent plasma cleaning machineApril 2024
    Request
  • PDF
    SGS test reportJune 2022
    Request
  • PDF
    RoHS test reportJanuary 2022
    Request

Reports are sent by email on request

Being documented.

In preparationFactory acceptance testThe checklist each system passes before it ships.
  • — Functional checks
  • — Process run
  • — Sign-off
In preparationInspection flowIncoming, in-process and final inspection.
  • — Inspection points
  • — Records
  • — Responsible roles
In preparationDelivery and site acceptanceThe documents that arrive with the machine and the acceptance on site.
  • — Delivery documents
  • — Site acceptance
  • — Training record

Need a certificate or report?

Ask for the certificate scan or test report you need — sent by email on request.